View more
Zepoch Logo White
Contact
info@zepoch.ioLugano, Switzerland
Language
Status
online

accepting_projects · lugano_ch

© 2026 Zepoch Sagl

Services
Industrial·3-12 months

Industrial Software & IoT

MES, WMS, machine data, barcode and traceability for factory and warehouse work, released by controlled areas and flows.

Timeline3-12 months
Stack
MESWMSIoTOPC UA
01

About

Start from a real area

Industrial software should not begin as a huge program. The right starting point is usually one line, a machine group, a warehouse flow, a quality routine or a step where reliable data is missing today.

Where digital work touches physical work

MES, WMS, machine data, barcode, inventory, traceability and dashboards work only if they respect how people work on the floor. Timing, shifts, network limits, scanners, errors and fallback procedures matter as much as software architecture.

Proven by real factory and warehouse work

Proven by ARACNE for machine status and maintenance, ZAMA for barcode/AS400 warehouse flows, and Dual Label Printer for shop-floor label automation.

Integrate without replacing everything

We connect ERP, databases, scanners, machines or existing tools where operational visibility is needed. There is no need to force every flow into one system if a targeted integration removes the bottleneck.

Controlled rollout

We first validate data, adoption and stability in a limited scope. Then we extend to more lines, departments or sites only when operators understand the system and it handles edge cases.

02

Features

01

Pilot before rollout

We start with one line, machine group, quality station or warehouse flow before scaling.

02

Machine data, barcode and ERP

We connect shop-floor events, scanners, stock, orders and existing systems when they support operational work.

03

Interfaces for the floor

Simple screens for operators and supervisors, designed around pace, shifts, errors, unstable network and real procedures.

04

Operational reliability

Manual fallback, audit trails, monitoring and gradual rollout reduce risk when software enters production.

03

Examples

Example 01

Industrial Pilot

A pilot on one line, machine group or warehouse flow before rollout, with data capture, operator feedback and manual fallback.

Machine, scanner or ERP data connection
Production or warehouse flow tracking
Essential operational KPI dashboard
Operator interface for the pilot
Full inventory management
Extended quality workflow

Timeline: 4-10 weeks

Example 02

Industrial Rollout

A MES/WMS system or industrial workflow in production, with multi-line support, inventory, traceability, dashboards, support and handover.

Multi-line or multi-flow operational control
Inventory and warehouse workflows
Traceability and quality checkpoints
OPC UA, scanner, ERP or database integration
Shift, resource and support model

Timeline: 3-9 months

04

Proven by real work

What would you like to work better?

It might be an Excel file that has become unmanageable, a manual process, business software that does not talk to other systems, or a task that takes too much time.